in Suweon Republic of Korea sales price shop near me near me shop factory supplier High Speed Rope Weaving Machine manufacturer best Cost Custom Cheap wholesaler

  in Suweon Republic of Korea  sales   price   shop   near me   near me shop   factory   supplier High Speed Rope Weaving Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

At any time-Power Group CO., LTD. IS Specialist IN Generating ALL Types OF MECHANICAL TRANSMISSION AND HYDRAULIC TRANSMISSION LIKE: PLANETARY GEARBOXES, WORM REDUCERS, IN-LINE HELICAL Equipment Speed REDUCERS, PARALLEL SHAFT HELICAL Gear REDUCERS, HELICAL BEVEL REDUCERS, HELICAL WORM Equipment REDUCERS, AGRICULTURAL GEARBOXES, TRACTOR GEARBOXES, Vehicle GEARBOXES, PTO Travel SHAFTS, Specific REDUCER & Relevant Equipment Parts AND OTHER Relevant Items, SPROCKETS, HYDRAULIC System, VACCUM PUMPS, FLUID COUPLING, Gear RACKS, CHAINS, TIMING PULLEYS, UDL Velocity VARIATORS, V PULLEYS, HYDRAULIC CYLINDER, Gear PUMPS, SCREW AIR COMPRESSORS, SHAFT COLLARS Reduced BACKLASH WORM REDUCERS AND SO ON. The group is focused on generating all selection of regular roller chains and sprockets, gears & gearboxes, such as conveyor chain & sprockets , stainless metal chain, agricultural chain and has not just sold its merchandise all more than china, but also sold much more than 65% products to oversees, including Europe, America, South-east Asia, and it also has set up storage logistics in locations like Europe. Top quality and credit history are the bases that make a corporation alive.

The EPT motor of PGF hello-pace knitting EPTT is utilized with the approach of frequency conversion, which makes it possible for the stepless speed management even during the procedure, for instance: although the feeding breaks (finishes), the EPTT is routinely stopped whilst the car feeding system is utilized for knitting main fabirc, for each thick or thin main material inside the restrict, the delivery is uniform the EPTT is also stopped routinely even though main breaking(finishing) to keep away from degrated product. And the braided material that is manufactured with PGF hello-speed knitting EPTT is of increased qualify and a lot more reputable.

II, Purposes AND Materials OF KNITTING
PGF hello-speed knitting EPTT is able to knit curtain belt, shoe belt, cummerbund of the styles of column, pipe, and flat, and pipe-shape jacket, and so on.
Different kinds of substance are adoptable for PGF hi-pace knitting EPTT, this sort of as cotton yarn, chemical fibre yarn, silk, gentle metallic wire, and so on.

III, Attributes
PGF hi-velocity knitting EPTT is of the shut construction, practical for operation, hugely automatic, swift for adjustment, trustworthy for procedure, of decrease sound, of greater effectiveness, of EPT top quality and so on.

IV, Operation Methods
Ahead of starting up the EPTT, shall verify the pursuing objects:
one regardless of whether the EPTT stress is right
2 whether the earth unit is dependable
three whether the motor steering is proper
4 thoroughly clean up the desk, and other obstructions that influence the procedure of the EPTT
5 no matter whether the EPTT oil is competent (oil design, oil quantity)
As soon as the over products are checked and passed, follow up the beneath methods to start off the EPTT:
one join the EPTT (EPTT 2 phase 380v)
2 transfer the switch of EPT box to the level of quotON quot(the EPTT supply indicator is on, which indicates it is EPTTed)
3 push the start off button
4 turn the rotating-setup button clockwise
5 refer to the guide of frequency conversion EPTT to operation the EPTT.

V, Remedy FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) although the EPTT is doing work, the breaking indicator is on. Check out every yarn cop. If the yarn is damaged, pull the conclude of that yarn towards the completed knitting, and then press the startup button if the yarn cop is empty, consider off that one, and replace it and thread the yarn and pull the conclude of yarn towards the finished knitting, and then push the startup button. If the core is broken, verify the main unEPTTthe EPTT human body, and pull the finish of the core in direction of the concluded a single, and then press the button to knit.

VI, ADJUSTMENT OF Bound Velocity
To change the speed of the leading left EPT on the cEPTTr column can get various speed of sure, and diverse sheer-form cross points of every duration in mm (or named as item density, item no.)

Refer to the underneath chart and table 1 for details

DIAGRAM OF Gear

Contrast desk in between the certain velocity of hi-pace knitting EPTT and EPT EPTTble 1
(from the remaining to the right)
Frequency of motor: 60HzZB=30ZC=28
ZA velocity of bound CM/min variety of sheer-condition cross position/CM

Frequency of motor: 60HzZB=30ZC=36
ZA pace of sure CM/min amount of sheer-shape cross point/CM

Frequency of motor: 60HzZB=30ZC=38
ZA speed of certain CM/min number of sheer-form cross stage/CM

Notice: Whilst the frequency of motor is not 60HZ, the velocity of sure is that the benefit in the previously mentioned desk times the real operate frequency/sixty, and the sheer-shape cross point is not modified.

VII, Upkeep INTRODUCTION
For the EPTT that is getting utilized, should lubricate its direct, spline ingot groove, and the lubrication volume can not spill above, and it is best to lubricate it just staying away from dry-running. Have to insert oil on the concave ring of spline shaft, at lEPT two times per eigEPTT hours, many drops per time.
The oil that is mostly employed on the spline EPT box must be replaced entirely following one particular month, and then, is to be supplemEPTTd according to oil scale amount. In the course of the manufacturing, decide regardless of whether to trade lubrication (the lubrication used on the EPTT is 32#) in accordance to the oil position. Shall cleanse up the float on any elements frequently (do not do it although the EPTT is running).

VIII, Safety measures for Set up and Assembly amp Unassembled
Set up: must place the EPTT on the rigid floor, and have to preserve it in level after whilst setting up the rear table board.
Hanging Installation: if this EPTT is moved following dis-packaged, regardless of whether for forklift or crane, the stage of power shall alwaEPTTbe set on the reduced crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, must not on the table board of the knitting EPTT.

EPTTAL Component

Hello-velocity sealing knitting EPTT Operation handbook Overall eleven pages
Page six
7.two normal faults and remedy methods for frequency conversion EPTT in underneath desk

Fault screen Fault material amp description Remedy strategies
E.O.C.A Overcurrent in acceleration 1, verify regardless of whether the motor is shorted or partially shorted
2, increase the acceleration time
3, the configurations of frequency conversion EPTT is not rational, and EPT the potential of the frequency conversion EPTT
4, lessen the torque to boost the rated worth.
E.OC.n Overcurrent in consistent speed 1, check whether the motor is shorted, whether or not the output wire is insulated properly
2, verify whether the motor is stopped to operate, regardless of whether the mechanical load waves
three, check regardless of whether the potential of the frequency conversion EPTT is as well modest, and EPT the capability of the frequency conversion EPTT
four, verify no matter whether .the voltage of the EPTT network waves.
E.OC.d

E.OC.S

Overcurrent in deceleration
Overcurrent in halting
1 verify regardless of whether the wire insulation is nicely, whether or not the motor is shorted
2 EPT the deceleration time
3 replace by a frequency conversion EPTT of larger potential
4 the braking capability of immediate recent is way too big, and minimize the braking potential of immediate existing
five for the EPTT fault, ship back to the manufacturing unit for mend.
E.GF.S
E. GF.a
E. GF.n
E. GF.d
Shortcut to ground 1 examine whether or not the wire of motor is shorted
2 enhance the EPTT network, and check out whether there is the wave of voltage
3 send out back again for fix
E.ou.S

E.OU.a

E.OU.n

E.OU.d

Overcurrent in acceleration
Overcurrent in deceleration
Overcurrent in constant pace
Overcurrent in deceleration
one prolong the deceleration time, or insert with the brake resistor
2 increase the EPTT network, and check out no matter whether there is the wave of voltage.
E.Fb.S
E. Fb.a
E. Fb.n
E. Fb.d
Fuse melted

If fuse melted, send out back again for restore
E.Lu.s
E. Lu.A
E. Lu.n
E. Lu.d
Reduced voltage one examine whether the voltage is typical
2 check no matter whether the load waves
3 check out whether or not the stage is lacked.
E.OH.S
E. OH.A
E. OH.n
E. OH.d
Overheat of frequency
conversion EPTT
1 examine no matter whether the admirer is stopped to run, regardless of whether the radiating piece is protected by imEPT
2 verify no matter whether the surroundings temperature is normal
3 examine regardless of whether the airing space is sufficient, regardless of whether the air is convective
E. OL.A
E. OL.n
E. OL.d
Overload of frequency
conversion EPTT
150% for each moment
one examine no matter whether the frequency conversion EPTT is of scaled-down capacity, whether or not is lined by imEPT
2 check out whether the load of the EPTT is blocked
3 V/F curve is not set effectively, and shall be reset.

Hello-pace sealing knitting EPTT Procedure manual Whole 11 internet pages
Page 7
ongoing

E.OA.A
E.OA.n
E.OA.d
EPT overload a hundred and fifty% per a single minute one examine whether or not the mechanical load moves
two the motor distribution is also tiny
three the motor is overheated, and the insulation gets even worse
4 check whether the voltage moves tremendously
5 verify regardless of whether the section is lacked
6 the mechanical load is EPTd.
E.OT.A
E.OT.n
E.OT.d
Over-torque of motor one check out no matter whether the mechanical load moves
two check whether or not the motor configuration is way too modest.
E.bs.A
E. bs.n
E. bs.d
E. bs.s
The electromagnetic contactor assistant coil does not suggestions. Ship back for repair
E.bT.A
E. bT.n
E. bT.d
The brake transistor is damaged. Get in touch with with the factory.
E.EC.S
E. EC.n
E. EC.d
E.EC.A
CPU fault Contact with the factory.
E.EE.S
E. EE.n
E. EE.d
E.EE.A
E Prom fault Speak to with the factory.
ER External interference Insulation with the interference resource
ES Crisis parking UnEPTTthe unexpected emergency position
20 four-20mA damaged circuit EPT with the previously mentioned damaged one
Pr Miscalculation of specification setup Appropriate specification of set up
DCb Brake standing of direct recent UnEPTTthe brake standing of immediate present

Hello-pace sealing knitting EPTT Operation guide Complete 11 web pages
Web page 8
VIII, Essential perform, function show, operation introduction of HLPC 0D7523A EPTT procedure EPTT
8.1 essential perform of HLPC 0D7523A EPTT operation EPTT

one PROG programming/purpose display important
two EPTTR/DISP key of data affirmation, right after the information is amended, push this essential to validate the entry of info
3 up/down keys, decide on specification, amend details and so on.
four Run demand key of procedure, commence procedure
five Stop/RESET end/ reset essential, stop operation, and the operation is disturbed, and reset
6 FREQ Set frequency setup button, can established up this button in orEPTTto input the principal frequency.

Hi-velocity sealing knitting EPTT Procedure guide Whole eleven internet pages
Website page nine
eight.two Clarification of function screen products

  1. T fifty. frequency price fifty. HZ
  2. F fifty. rated frequency 50. HZ
  3. R 02. output of existing 2.0A
  4. U220 output of voltage 220V
  5. U540 direct voltage 540V
  6. r 39. temperature 39 ordmC
  7. .001 counter
  8. L50. PID opinions is 50%
  9. 000. managing pace
  10. Fo r optimistic operating
  11. r EU negative working

Hi-velocity sealing knitting EPTT Operation handbook Total eleven pages
Web page ten
eight.three Explanation of keyboard

EPTT on #8594 screen F00.(press PROG) #8594display FOR or REV (press PROG) #8594 current C000 (the perform code choice interface can make use of #9661 #9651keEPTTto alter the flash digit amount, the last digit flashes) #8594 (press EPTTR) present C000 (The 1st digit flashes) #8594 (press EPTTR) existing C000 (The 1st digit flashes) #8594 (press EPTTR) present C000, the previous digit flashes.

Instance: c111 is set as two, as subsequent
EPTT on #8594 display F00. #8594 FOR #8594C000 (the final digit flashes) #8594C001 (the last digit is transformed into one, and flashes) press EPTTR #8594C001 (The middle digit flashes) push #9651 #8594C011 (the middle digit is changed into 1, and flashes) push EPTTR #8594C011 (The very first digit flashes) press #9651 #8594C111 (the 1st digit is altered into one, and flashes) press EPTTR EPTT #8594present (press #9651) #8594present two (existing EPTTr EPTT, and it truly is alright) #8594C112

Hello-velocity sealing knitting EPTT Procedure manual Overall 11 web pages
Web page 11
VIII, EPT Diagram (see attachment)

VV, In depth EXPLAINATION OF FREQUENCY CONVERSION EPTT

I. EPTT Introduction
The substantial-pace braiding EPTT uses a variety of EPTT and novel design and style. Four sixteen-spindle braiding EPTTs are built-in into a single unity. By making use of the VFD-A sort alternating current motor EPTr that is produced by way of combining the laptop handle EPT, the centralized frequency-alter and stepless pace regulation can be realized. The EPTT is supplied with several sorts of automated protecting features this sort of as: automatic end even though the line breaks, over torque, in excess of voltage, unEPTTvoltage, overheating, over load and so on. The EPTT also has various outstXiHu (West EPT) Dis.Hu (West EPT) Dis. rewards, for example: higher rotate speed, high generation performance, small ground area, minimal sound, EPTT support lifestyle and effortless procedure as effectively as vitality conserving. It is the upgrading and new technology item of classic disc braiding EPTT.
II. Standard EPTnical Parameters
Rated EPTT of motor: 075W
Rated speed of motor: 1390r/min
Quantity of spindle: sixteen*4 960*790*700(L*B*H)
24*2 1240*620*seven hundred(L*B*H)
Specification of quill:( Phi48*160)mm
Spindle speed: 350r/min
Approach of speed adjustment: frequency-change and stepless pace regulation
III. Support Situations
Voltage of EPTT source: AC220V plusmn10%HUO or AC380V plusmn10%
Frequency of EPTT supply: 50HZ plusmn5%
Ambient temperature: -10 ordmC-forty ordmC(no condensation and no freeze)
Ambient humidity: unEPTT90%RH(no condensation)
Functioning atmosphere: no water droplets, steam, dust and grease stain
no putridity, flammable gas and liquid
no drifting dust and metallic particle
reliable foundation, no critical vibration
no interruption of electromagnetic sound.
IV. Set up
4.1The tools fixture foundation are not necessary for the installation of this EPTT. Only spot the EPTT on the sound and even concrete ground and keep level without having vibration.
4.2 Configuration of EPTT EPT
4.2.one In accordance to the consumer demand from customers, the EPTT may offer large speed braiding EPTTs that are used to two sorts of voltage stages: 220V, 50HZ and 380V, 50HZ. The person shall link strains correctly in accordance to the pertinent voltage degree of obtained gear. Be sure no incorrect connection so as to stay away from that the EPTT can’t function normally or any hurt happens.
four.two.2 When consumer disposes the EPTT source of high pace braiding EPTT, you should EPTTly care whether there is a dependable ground line in the electrical energy grid (SV220VAC380V)program (i.e. No matter whether there is reputable grounding for socket grounded phase of EPTT offer AC220V or AV380V). If not, an added protective floor line for the EPTT must be created. Its foundation resistance shall not be above 4 Omega. And then merge it into the grounded phase of EPTT socket (SV220V or AC380V) or inducted to the grounding conclude of the EPTT straight.

four.two.three The EPTT line link of the EPTT is currently completed for users. The grounded stage of EPTT supply plug is rightly connected with grounding stop of the EPTT. The user just wants to insert the EPTT provide plug into the EPTT supply socket that is ready in accordance to related voltage degree to hook up the existing.
four.3 In the circumstance of not connecting the current, open the doorway of EPT management box with the presented key to check no matter whether electric powered aspects in EPT control box are broken or loosening. If the connecting line is loosening, pertinent steps must be done in time.
5.one No-load Test
five.one.1 Swap on the EPTT provide of EPT control box
five.1.2 Turn on the switch of EPTT source within the EPT management box. If the indicating lamp of EPTT provide on the handle panel and relevant indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that every little thing is rigEPTT and no-load examination can be operated.
5.one.three Flip the pace-regulating potentiometer of frequency location knob on the EPT control box panel back again to the scale 50(anti-clockwise rotation). Instantaneously push the button to make the EPTT to rotate instantaneously and observe no matter whether it is rotating clockwise or not. If not, trade the positions of U and V of output port of frequency changer. View and make sure that the all working is fleXiHu (West EPT) Dis.ble and clean to make certain no obstacles and abnormal clash. If something wrong occurs, relevant motives should be found in orEPTTto fix the issue.
five.one.4 Press the startup button on manage panel, then steadily increase the managing pressure of alternating motor EPTr (i.e. little by little rotate the potentiometer knob clockwise) at the identical time, view and guarantee that the speeds of motor and rotation board are increasing gradually and that the managing is normal.
5.1.5 Press the quit button on manage panel and look at whether the motor is synchronized with the instruction. If not, the purpose shall be located in orEPTTto remove the fault.
five.2 Load Test
5.2.1 Following no-load test is concluded, the load test can be operated. Location the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the needed specified quill with the essential colour yarn in accordance to the fancy yarns that will be weaved and get almost everything ready.
5.two.two Swap the velocity-regulating potentiometer knob on the EPT control box panel back again to the scale , instantaneously press the button to flip on motor and make it rotate. View that the running of quill has obstacle or clash. If some thing incorrect occurs, the explanation shall be located in orEPTTto remove the fault.
5.two.3 Thrust the startup button and flip the pace-regulating potentiometer knob. Make the motor to hold working for a while(five~10min)in the velocity of 1000r/min. If every little thing is right, lower off 1 yarn by handbook. If the motor is turned off at as soon as, it is proved that computerized stop protective device is sensitive. So, the EPTT take a look at is completed fully. The EPTT can be place into the regular creation.
VI. Certain Notices
In orEPTTto make certain the securities of folks and tools and acquire the greatest service result, we would like to particularly rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of end users that subsequent cases must be paid out far more attentions while installing this EPTT.

six.1 The workshop with the set up of this EPTT should have great floor wire with floor resistance of considerably less than four

6.two This EPTT must be grounded independently it shall not be jointly grounded with higher electrical-existing EPTTs, these kinds of as electric powered welding EPTT and higher-EPTT electric powered motor. The EPTal region of ground line ought to be equal or a lot more than 4mm2.
6.3 Just before this EPTT is remaining from the production factory, for 108 parameters of frequency changer, adhering to eighteen parameters (see table one) need to have to reset in accordance to needs of the EPTT technological functionality, and the other 130 parameters are all stored as what they are set at producing factory. If there is no EPTT desire, buyers remember to do not randomly modify frequency changer parameters any far more.

Purpose code Function Location scope and purpose rationalization Established price
C001 Accelerating time placing .one~6500S 4
C006 Intermediate voltage location .one~255/510 thirteen
C007 Intermediate frequency environment .01~600 2.five
C571 Max. frequency setting fifty.~600. 50
C012 Running handle placing ~2 one
C013 Operating frequency choice ~2 one
C015 Halting way choice ~one 1
C016 Reverse turning choice ~1 one
C571 Startup frequency placing .1~10 five
C571 Inching frequency setting ~600 twenty
C033 Accelerating time location .one~6500S three
C050 Multi-purposeful input finish FOR one
C051 Multi-practical enter conclude REV four
C053 Multi-practical input finish SPH 7
C075 Analog quantity EPT placing .~600 50
C088 EPT rated rotate velocity ~9999 270
C100 EPTT torque payment .~10. five

6.4 When frequency changer outputting, in output aspect main circuit, alternating existing getting in touch with spot is not allowed delivering and breaking EPTT provide.
six.five When the temperature in workshop surpasses forty ordmC, forced air cooling evaluate need to be adopted to EPT management box.
six.6 When more than torque or other faults come about, ahead of the cause is clear and faults are solved, frequency changer cannot be started once again in orEPTTto steer clear of bringing damage to the EPTT. The approach of restarting frequency changer is: 1. Firstly press the RESET button on frequency changer EPTT operator panel and then push the cease button on primary managing EPT box procedure panel and last but not least push the startup button two. Swap off the EPTT provide in primary managing EPT box and switch on again, and then press the startup button.
6.7 When the swap of EPTT offer in EPT control box is turned off and ahead of indicating lamp on frequency changer EPTT operator panel goes out, any part of circuit within EPT control box can’t be touched or any assembly and disassembly and wiring are not able to be carried out.
six.eight Following braiding spindle is installed in the quill, reverse turning is not permitted any far more in this EPTT.
6.nine Max. functioning rotate speed of this EPTT is designed as 350r/min, but actually economical rotate speed is about 300r/min. Prior to this EPTT leaves producing manufacturing facility, its max. working rotate speed is set to be limited in inexpensive rotate speed scope. Buyers you should do not randomly change corresponding parameters any more to increase the pace. In this way, EPTT accident can be averted.
6.ten This EPTT can’t run EPTT time (considerably less than 30min) at lower pace of significantly less than 100r/min, normally electrical motor will be ruined thanks to overheating.
6.11 It is unfavorable for this EPTT to be began and stopped at minimal or high rotate speed (when the EPTT is started, if rotate speed is too reduced, starting torque is reduced and this EPTT is difficult to be began up but if rotate speed is as well higher, commencing current is way too higher and frequency changer is very easily overloaded. When the EPTT is stopped, if rotate pace is too high, frequency changer is simply to be more than voltage. When the EPTT is started up, please to start with flip the knob of velocity-regulating potentiometer on EPT control box operation panel to the scale fifty (about 100r/min) and then press the startup button. When the EPTT is stopped, you should switch the knob of speed-regulating potentiometer back again to the scale fifty and then push the cease button.
6.12 Pressure-proof check of spare components inside of frequency changer is forbidden.
6.13 The important of EPT management box of this EPTT is retained by its operator. And non-operator can’t function main controlling EPT box.
six.fourteen The electric powered component of this EPTT ought to be managed and fixed by experienced and skilled EPT experts.
seven.Common faults and solutions
seven.1 Common faults and options of EPT management circuit can be noticed in table two.

EPT-speed Braiding EPTT Instruction Overall pages
No. Web page
No. Fault Fault purpose and solution
1 Swap on EPTT supply 1.one Indicating lamp does not light line end looses or fuse breaks
2 Inching button two.1 Electrical motor can not operate instantaneously
2.1.one Very poor make contact with of the button
2.1.2 Error of parameter environment
two.one.3 Fault of frequency changer
two.one.4 Poor speak to of electric powered motor link or fault of electric powered motor
2.one.5 Obstacles at managing element of the system
three Press the startup button
four Press the quit button
5 EPTT end can not show up when the line breaks 5.one.1 Fault or hurt of electronic circuit
5.12 Mini-relay
5.1.3 Fault of EPTT transformer
five.1.four Harm or bad make contact with of line-crack mini-relay

  in Suweon Republic of Korea  sales   price   shop   near me   near me shop   factory   supplier High Speed Rope Weaving Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Suweon Republic of Korea  sales   price   shop   near me   near me shop   factory   supplier High Speed Rope Weaving Machine manufacturer   best   Cost   Custom   Cheap   wholesaler